Identify 3 preliminary quality factors you would like to implement in the robot outlined above. Present the factors using a Quality Management and Control Tool so they can be discussed with your team and ideas from team members can also be included.

Please answer the below questions ASAP!

Project Cost and Quality Management Assignment

1. (12 pt.) Lets assume that you are a Principal Systems Engineer designing a robot that aims to mobilize people and supplies during emergency situations. The prototype would be tested against various simulated emergency aid capabilities, such as fire extinguishing, hurricane evacuation, suicide prevention, bomb threat mitigation and SWAT operations.

a) (2 pt.) Based on your research and analysis, identify 3 preliminary quality factors you would like to implement in the robot outlined above. Present the factors using a Quality Management and Control Tool so they can be discussed with your team and ideas from team members can also be included.

b) (2 pt.) Provide brief descriptions for each of the quality factor.

c) (3 pt.) During quality planning, you are creating a quality checklist to verify that the robot will detect heat and follow a path towards the possible fire while acting as a fire extinguisher. While searching for a path using only one heat sensor near its head, the robot will be performing the following activities:
i. Detect heat
ii. Move towards heat
iii. Move backward up to 1 ft. if there is an obstacle
iv. Move left up to 1 ft. v. Send SOS, if no moves can be performed
Use a flowchart to demonstrate how decisions would be made to move towards the heat source from the steps above (Only blocks and arrows are sufficient, handwritten flowchart can be inserted in word document too ).

d) (2 pt.) List and briefly describe 3 risks or potential causes that might make the robot immobile or inoperable during emergencies.

e) (3 pt.) Consider the following parts costs to build an initial robot prototype

Assuming that the actual cost for a part falls uniformly within the range, provide the best, worst and average cost for the initial robot prototype.
———-
Added on 20.05.2016 12:28
No Sources are needed!

Time is more important than quality right now…. if possible please send it back ASAP (1 hour would be best…)

Thank you so much!!


 

. WITH nursing writers TODAY AND GET AN AMAZING DISCOUNT

get-your-custom-paper

The post Identify 3 preliminary quality factors you would like to implement in the robot outlined above. Present the factors using a Quality Management and Control Tool so they can be discussed with your team and ideas from team members can also be included. appeared first on nursing writers .

 

“Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!”

The post Identify 3 preliminary quality factors you would like to implement in the robot outlined above. Present the factors using a Quality Management and Control Tool so they can be discussed with your team and ideas from team members can also be included. appeared first on nursing writers.


Identify 3 preliminary quality factors you would like to implement in the robot outlined above. Present the factors using a Quality Management and Control Tool so they can be discussed with your team and ideas from team members can also be included. was first posted on July 14, 2019 at 2:51 pm.
©2019 "Nursing Paper Tutors". Use of this feed is for personal non-commercial use only. If you are not reading this article in your feed reader, then the site is guilty of copyright infringement. Please contact me at admin@nursingassignmenttutor.com

 

"Are you looking for this answer? We can Help click Order Now"